| Sr No | Particular | Sequence of Activity | 
|---|---|---|
| 1 | Quote to customer of his Inquiry as per his requirement | Quotation | 
| 2 | Drawing, Sample and order with Schedule are Received from Customer | Order / Planning | 
| 3 | Job card release/Whole Designing And detail designing and preparing parts drawing | Design / Release | 
| 4 | Order to vendor for raw material requirement or order to customer for arrange | Raw Material Order | 
| 5 | Received Raw Material (casting or bar or block) from customer / outside vender source | Raw Material Inward | 
| 6 | Checked raw goods and if require prepare pre-machining drawing | Inspection | 
| 7 | Send it to vendor or inhouse convensional shop for pre-machining/part making with drawing | Pre-machining (Conventional Shop) | 
| 8 | Received it to VMC/CNC shop and checked pre-machining dimension | CNC Shop / Inspection | 
| 9 | Prepare Programme and inspection report with set up sheet and clamping | Programming/Setting | 
| 10 | Inspect durring machining after each programme | In-process Inspection | 
| 11 | After completed VMC/CNC process send it for final inspection | Inspection | 
| 12 | Send it to Convensional shop for Assembly (all part from VMC and conventional and readymade) | Assembly | 
| 13 | After Assembly completed polished goods | Polishing | 
| 14 | After polishing and Assembly inspect all throughly | Inspection | 
| 15 | If require, trial all Assembly | Trial | 
| 16 | Packing in boxes for dispatch | Packing | 
| 17 | Dispatch with require Document | Dispatch | 
| Sr No | Particular | Sequence of Activity | 
|---|---|---|
| 1 | Quote to customer of his Inquiry as per his Requirement | Quotation | 
| 2 | Drawing, Sample and order with Schedule are Received from Customer | Order / Planning | 
| 3 | Received Raw Material (casting or bar or block) from customer / outside vender source | Raw Material Inward | 
| 4 | Prepare Job card & Checked raw goods and if require prepare pre-machining drawing | Schedule / Designing | 
| 5 | Send it to vendor or inhouse convensional shop for pre-machining with drawing | Pre-Machining (Conventional Shop) | 
| 6 | Received it to CNC shop and checked pre-machining dimension | Ready for CNC shop/Inspection | 
| 7 | Prepare Programme and inspection report for production as per job card | Programming/Setting | 
| 8 | First piece checked throughly after trial and before start production | Trial/Inspection | 
| 9 | After completed CNC process send it for final inspection | Inspection | 
| 10 | Send it to VMC shop (Vendor) if its require | VMC/Milling process | 
| 11 | After VMC completed deburred(polished) goods send it for hole and tapping | Hole/Tapping | 
| 12 | Hole And Tapping Done By Using Jigs And Fixture As Per Require Quality | Hole/Tapping | 
| 13 | After Finished All Operation, Polished And Cleaning And Deburred All Components | Polishing/Cleaning | 
| 14 | Final Inspection Report Fill Up And Checked | Final Inspection | 
| 15 | Packing In Boxes For Dispatch | Packing | 
| 16 | Dispatch with require Document | Dispatch |